I had planned to have a completely finished, just-needs-blocking-and-a-clasp sweater to show you in this post… and then I decided that I was going to do a tubular bind off on the band. Which means grafting about 400 stitches.
tubular bind off

It’s gonna be another day or two. (Especially if I keep taking breaks to detangle Sandi’s poor Malabrigo Sock.)
lego man, master detangler

Leave a Reply

(required)

(required)

© 2013 jeshknits: the blog! Suffusion WordPress theme by Sayontan Sinha